CONTACT US

BTE Tower Shear

Extreme power for the removal of concrete tie towers. Four, ultra heavy-duty cylinders, provide the crushing power to rapidly remove towers and clips. Once towers are eliminated, concrete ties can be removed with little to no jacking of the track, saving time and money resurfacing the track.

Height 40.00 in
Length 40.00 in
Weight 1500.0 lb
Width 26.00 in