Tie Handling

Tie Dragon

Attachment
Increases productivity by lifting and spacing multiple ties at once. Streamlines installation with less manual adjustment and more consistent spacing.

overview

Concrete ties are heavy and difficult to unload, handle, space, and place. With the BTE Tie Dragon, this dangerous task has been simplified and streamlined. Railroads are achieving production rates of 1,200 concrete ties picked, spaced, and placed in one shift.

Features

  • Picks, spaces, and places ties with precision for maximum efficiency
  • Delivers high-speed production with up to 1,200 ties placed per shift
  • Reduces singular tie handling, lowering risk of injury and time spent on-track
  • Heavy-duty design easily handles 7 concrete ties per pick
  • High-precision ensures consistent tie placement for track stability.
  • Keeps demanding rail construction projects on schedule by maximizing track time

BTE Means It’s Built Better

Customizable Spacing

Adjustable tie spacing from 24" to 30" delivers maximum versatility when placing ties

Maximum Efficiency

Handle seven concrete ties per pick for faster transport and placement of concrete ti

Easy Handling

Hydraulically-powered clamps and 360 degree rotation make adjusting tie placement simple

Buy. Lease.

Get the attachments you need, right when you need them.

At-a-Glance

SpecificationUSMetric
Height/Length40” x 175”1,016 mm x4,445 mm
Width117”2,972 mm
Weight8,000 lbs3,629 kg
Hydraulic Flow Reqs.10 to 20 GPM37 to 75v l/m
Auxiliary Hydraulic Pressure Reqs.(1) Bi-Directional Circuit
Lift Capacity3-7 Concrete Ties

Applications

Compatible Machines

Need it now? Let's connect.

BTE has an array of attachments for all of your hi-rail excavators and backhoes. With our headquarters in Missouri and strategic BTE locations across North America, the machines you need can be available as soon as now.

Explore More Attachments

BTE engineers versatile, dependable attachments for every hi-rail application. Explore our full line of work attachments and experience the BTE difference.

Let’s Talk Solutions

BTE is here to make railroad track maintenance and construction safer, simpler, and faster. Tell us what your team needs. We’ll build a better tomorrow together.

Resources

Maintenance, Equipment, Insights

If the hi-rail equipment you depend on isn’t keeping up, the whole operation goes out of balance.

Equipment, Maintenance

Railroad construction and maintenance has never been easy. But increasing freight volumes, higher train speeds, and growing pressure to minimize track outages only make maintenance of way crews’ work more demanding.

Insights, Compliance

Meeting FRA regulations isn't only about compliance. It's about using every tool available to us to maintain safe, efficient railroad operations.